Posts Tagged ‘bridge work’
UPDATED: DelDOT has Closed a Portion of Fleetwood Pond Road for Bridge Repairs
UPDATED – 06/16/26 – Fleetwood Pond Road is now closed between Old Furnace and Baker Mill Roads for construction. Crews will be working to repair the spillway – including bridge deck repairs, joint sealing and painting. Detours are posted. Weather permitting the bridge should reopen on July 18. ================================= ORIGINAL STORY – 06/12/26 – The…
Read More